WhatsApp Bangladesh Email Tiffany
WhatsApp Email
Quality

Quality control and proof before shipment

Most bearing disputes happen because of missing proof. Our focus is to lock the spec, control the process, and deliver inspection evidence.

Quality control checklist

A

Drawing match

Confirm drawing revision, tolerance, material, and heat treatment requirement.

B

Process control

Key dimensions, raceway geometry, runout, gear, bolt holes, sealing, grease path.

C

Final inspection

Dimensional report, photo record, packing check, and document consistency.

Documents we can provide

  • Dimensional report, key dimensions only or full report
  • CMM report when required
  • Material certificate, heat treatment report when specified
  • Packing list and invoice consistency check
  • Photo record for packing and marking

If you need special standard like ISO, DIN, ASTM, EN, tell it in RFQ.

Bearing parts

Common buyer mistake

Buyer sends only one photo and says “same as sample”. Then factory makes different version. To avoid this, always send drawing revision and critical dimension list, and ask for measurement report.

RFQ checklist